626 1999-2001

Removal & Installation

Print

  1. Disconnect the negative battery cable.
  2.  
  3. Remove the transverse member on 2.5L engines.
  4.  
  5. Remove the flange nut.
  6.  
  7. Remove the adjusting bolt.
  8.  
  9. Remove the drive belt.
  10.  
  11. Remove the pressure switch connector.
  12.  
  13. Remove the pressure pipe.
  14.  
  15. Remove the return hose.
  16.  
  17. Remove the power steering pump and bracket.
  18.  

To install:

  1. Installation is the reverse of removal.

    Click image to see an enlarged view

    Fig. Exploded view of the power steering pump assembly-626 with 2.0L engine



    Click image to see an enlarged view

    Fig. Exploded view of the power steering pump assembly-626 with 2.5L engine

  2.  

 
label.common.footer.alt.autozoneLogo