Altima 2007-2009

Removal & Installation

Print

2.5L Engine



Specific to:

Nissan Altima 2009-2010

  1. Drain engine coolant from the radiator.
    CAUTION
    Perform when engine is cold.

  2.  
  3. Remove air cleaner duct assembly.
  4.  
  5. Disconnect upper radiator hose.
  6.  
  7. Disconnect fan motor connectors.
  8.  
  9. Remove radiator cooling fan assembly.

    Click image to see an enlarged view

    Fig. Remove radiator cooling fan assembly

  10.  

To install:

  1. Installation is in the reverse order of removal.
  2.  
  3. After installation refill engine coolant and check for leaks.
    CAUTION
    Do not spill coolant in engine compartment. Use a shop cloth to absorb coolant.

  4.  

3.5L Engine



Specific to:

Nissan Altima 2009-2010

  1. Drain engine coolant from the radiator.
    CAUTION
    Perform when engine is cold.

  2.  
  3. Remove CVT control module (if equipped).
  4.  
  5. Remove battery tray.
  6.  
  7. Disconnect upper radiator hose.
  8.  
  9. Disconnect fan motor connectors.
  10.  
  11. Remove radiator cooling fan assembly.

    Click image to see an enlarged view

    Fig. Remove radiator cooling fan assembly

  12.  

To install:

  1. Installation is in the reverse order of removal.
  2.  
  3. After installation refill engine coolant and check for leaks.
    CAUTION
    Do not spill coolant in engine compartment. Use a shop cloth to absorb coolant.

  4.  

 
label.common.footer.alt.autozoneLogo