GM Full-Size Trucks 1988-1998 Repair Information

Adjustments

Print

SHIFT LINKAGE



See Figure 1

  1. Loosen the nuts on either side of the swivel. Refer to the illustration of the floor shift linkage for component location.
  2.  
  3. Move the shift control lever to neutral and move the control levers to the front detent and then back one. This will place the transmission in neutral.
  4.  
  5. Place a 0.249-0.250 in. (6-7mm) gauge pin through the control levers and hold the shift rod levers forward tightly and tighten the nuts.
  6.  
  7. Remove the gauge pin and lubricate the levers.
  8.  



Click image to see an enlarged view

Fig. Fig. 1: Exploded view of the shift lever and components-89mm 4-speed overdrive

 
label.common.footer.alt.autozoneLogo