Mercedes-Benz Truck 2000-05

Removal & Installation

Print

  1. Before servicing the vehicle, refer to the Precautions section.
  2.  
  3. Remove or disconnect the following:

    Negative battery cable
     
    Heater hoses
     
    Upper and lower steering column covers
     
    Combination switch
     
    Instrument cluster trim
     
    Instrument cluster screws
     
    Footwell screws on both sides
     
    Lower instrument panel screws
     
    Instrument panel center section
     
    A/C heater control panel
     
    Center instrument panel screws
     
    Glove box
     
    Instrument panel end caps
     
    Instrument panel clips
     
    Parking brake handle
     
    Instrument panel bottom section
     
    A pillar trim on both sides
     
    Upper air outlet panel
     
    Top instrument panel screws
     
    Instrument cluster
     
    Sun sensor
     
    Air distribution connector
     
    Remaining instrument panels screws
     
    Instrument panel
     
    Air conditioning housing
     
    Heater core
     

  4.  


    Click image to see an enlarged view

    Fig. Instrument panel assembly-


To install:

  1. To install, reverse the removal procedure.
  2.  
  3. Connect the negative battery cable.
  4.  
  5. Fill the engine with coolant and check for proper heater operation.
  6.  

  1. Before servicing the vehicle, refer to the Precautions section.
  2.  
  3. Remove or disconnect the following:

    Negative battery cable
     
    Heater hoses
     
    Instrument panel
     
    Air conditioning housing
     
    Heater core

    Click image to see an enlarged view

    Fig. Exploded view of the heater core mounting

     

  4.  

To install:

  1. To install, reverse the removal procedure.
  2.  
  3. Connect the negative battery cable.
  4.  
  5. Fill the engine with coolant and check for proper heater operation.
  6.  

 
label.common.footer.alt.autozoneLogo