Nissan/Datsun 200SX/510/610/710/810/Maxima 1973-1984 Repair Guide

Power Steering Pump

Print

REMOVAL & INSTALLATION



  1. Remove the hoses at the pump and plug the openings shut to prevent contamination. Position the disconnected lines in a raised attitude to prevent leakage.
  2.  
  3. Remove the pump belt.
  4.  
  5. Loosen the retaining bolts and any braces, and remove the pump.
  6.  
  7. Installation is the reverse of removal. Adjust the belt tension by referring to the Belts information in , General Information and Maintenance. Bleed the system.
  8.  

BLEEDING



  1. Fill the pump reservoir and allow to remain undisturbed for a few minutes.
  2.  
  3. Raise the car until the front wheels are clear of the ground.
  4.  
  5. With the engine off, quickly turn the wheels right and left several times, lightly contacting the stops.
  6.  
  7. Add fluid if necessary.
  8.  
  9. Start the engine and let it idle.
  10.  
  11. Repeat Steps 3 and 4 with the engine idling.
  12.  
  13. Stop the engine, lower the car until the wheels just touch the ground. Start the engine, allow it to idle, and turn the wheels back and forth several times. Check the fluid level and refill if necessary.
  14.  



Click image to see an enlarged view

Fig. Fig. 1 no caption



Click image to see an enlarged view

Fig. Fig. 2 no caption



Click image to see an enlarged view

Fig. Fig. 3 no caption



Click image to see an enlarged view

Fig. Fig. 4 no caption



Click image to see an enlarged view

Fig. Fig. 5 no caption



Click image to see an enlarged view

Fig. Fig. 6 no caption



Click image to see an enlarged view

Fig. Fig. 7 no caption



Click image to see an enlarged view

Fig. Fig. 8 no caption



Click image to see an enlarged view

Fig. Fig. 9 no caption



Click image to see an enlarged view

Fig. Fig. 10 no caption



Click image to see an enlarged view

Fig. Fig. 11 no caption

 
label.common.footer.alt.autozoneLogo