Nissan Quest 2001-02 and 2004-06

Removal & Installation

Print

3.3L Engine



  1. Before servicing the vehicle, refer to the precautions section.
  2.  
  3. Disconnect the negative battery cable.
  4.  
  5. Discharge refrigerant into refrigerant recycling equipment.
  6.  
  7. Remove manifold bolt.
  8.  
  9. Remove manifold and inlet/outlet compressor cap.
  10.  
  11. Loosen idler pulley adjusting bolt.
  12.  
  13. Remove compressor drive belt.
  14.  
  15. Disconnect compressor harness connectors.
  16.  
  17. Remove four compressor fixing bolts.
  18.  
  19. Remove compressor.
  20.  
  21. Remove manifold O-rings from compressor housing.
  22.  
  23. To install, reverse removal procedure.
  24.  

 
label.common.footer.alt.autozoneLogo