Protege 1999-2000

Removal & Installation

Print

1.6L (Zm) Engine



  1. Disconnect the negative battery cable.
  2.  
  3. Remove the adjusting bolt.
  4.  
  5. Remove the drive belt.
  6.  
  7. Remove the pressure switch connector.
  8.  
  9. Remove the pressure pipe.
  10.  
  11. Remove the return hose.
  12.  
  13. Remove the bracket.
  14.  
  15. Remove the power steering pump and bracket.
  16.  

To install:

  1. Installation is the reverse of removal.

    Click image to see an enlarged view

    Fig. Exploded view of the power steering pump assembly-Protégé with 1.6L engine

  2.  

 
label.common.footer.alt.autozoneLogo