Toyota Land Cruiser, Sequoia 6 2001-06

Removal & Installation

Print

  1. Before servicing the vehicle, refer to the Precautions section.
  2.  
  3. Drain the engine coolant.
  4.  
  5. Disconnect the control cable.
  6.  
  7. Using pliers, grip the claws of the hose clips and slide the hose clips along the hose.
  8.  
  9. Disconnect the water hoses.
  10.  
  11. Remove the bolt and water valve.
  12.  

To install:

  1. Installation is in the reverse order of removal.
  2.  
  3. Check the water valve operation as follows:
    1. Turn the ignition switch to ON.
    2.  
    3. Operate temperature control switches to MAX. COOL and MAX. WARM, then check water valve operation, as shown in the illustration.

      Click image to see an enlarged view

      Fig. Check the water valve operation

    4.  

  4.  
  5. If operation is not as specified, adjust the water valve cable as follows:
  6.  
  7. Disconnect the control cable.
  8.  
  9. Turn the ignition switch to ON.
  10.  
  11. Set temperature control switches to MAX. COOL.
  12.  
  13. Set the water valve lever to the -COOL- position, connect the control cable and lock the clamp.

    Click image to see an enlarged view

    Fig. Adjusting the water valve control cable

  14.  

 
label.common.footer.alt.autozoneLogo