Toyota Land Cruiser, Sequoia 6 2001-06

Removal & Installation

Print



Click image to see an enlarged view

Fig. Radiator attachment bolts

  1. Before servicing the vehicle, refer to the Precautions section.
  2.  
  3. Remove the engine under cover.
  4.  
  5. Drain the engine coolant.
  6.  
  7. Disconnect the radiator reservoir hose from the radiator.
  8.  
  9. Disconnect the upper radiator hose from radiator.
  10.  
  11. Disconnect the lower radiator hose from radiator.
  12.  
  13. Disconnect the a/t oil cooler hoses from radiator.
  14.  
  15. Remove the 2 clips and No.2 fan shroud.
  16.  
  17. Remove the 4 bolts and radiator assembly.
  18.  

To install:

Click image to see an enlarged view

Fig. Radiator installation

  1. Set the radiator bracket hooks to the radiator support holes.
  2.  
  3. Install the 4 bolts and tighten to 12 Nm (120 Nm, 9 ft. lbs.)
  4.  
  5. Install the No.2 fan shroud with the 2 clips.
  6.  
  7. Connect a/t oil cooler hoses to the radiator.
  8.  
  9. Connect the upper radiator hose to the radiator.
  10.  
  11. Connect the lower radiator hose to the radiator.
  12.  
  13. Connect the radiator reservoir hose to the radiator.
  14.  
  15. Fill with engine coolant.
  16.  
  17. Start engine and check for engine coolant leaks.
  18.  
  19. Recheck engine coolant level.
  20.  
  21. Install engine under cover.
  22.  

 
label.common.footer.alt.autozoneLogo